Is there any way to get MP2 to properly display the actual hours required for a Multitask (multiple machines on one PM) in the Work Order Projection report? If a PM takes 1.5 hours with 10 machines the report displays .15 hours. With 16 similar PMs, MP2 shows a total of 19 hours when the reality is 76 hours. This makes it very difficult to balance the workload over three shifts through year end.
 
Posts: 6 | Location: Boca Raton & Key Largo, FL | Registered: 23 March 2006Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
What version of MP2 are you running?

How are you setting up your Task?

I just created a Task with 3 pieces of equipment. I also add the task would requie 3 hours. Then I ran the projection report, in the projection report it lists 3 hours.


Please email me with any questions:
Jonathan.Clark@cmmsdatagroup.com
 
Posts: 23 | Location: Chicago, IL | Registered: 07 March 2008Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
Try taking an existing task - one that has been used for a year or so - and add three pieces of equipment to it. Or generate then close the one you created then change the hours and see if it prints correctly. There should be some way to set the averaging period.
 
Posts: 6 | Location: Boca Raton & Key Largo, FL | Registered: 23 March 2006Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
I did add more equipment to a task, generated and closed one then changed the hours and the Projection Report was accurate.

I am not sure what you mean by the average period.


Please email me with any questions:
Jonathan.Clark@cmmsdatagroup.com
 
Posts: 23 | Location: Chicago, IL | Registered: 07 March 2008Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
Back to projections. You can enter a time in Task Duration and Estimated Labor Hours. For a PM with 7 machines, if I enter a TD = 0, EL = 4, the projection report shows .8 hours. If I enter TD = 3 and EL = 7, the projection shows 1.4 hours. If I enter TD = 3 and EL = 3, then I get a .6 task projection. Any ideas will be appreciated.
 
Posts: 6 | Location: Boca Raton & Key Largo, FL | Registered: 23 March 2006Reply With QuoteEdit or Delete MessageReport This Post
 Previous Topic | Next Topic powered by eve community Page 1 2  
 


Copyright © 2004-2008 NetexpressUSA Inc. All rights reserved.