Page 1 2 
Go
New
Find
Notify
Tools
Reply
  
-star Rating Rate It!  Login/Join 
Posted Hide Post
Thanks Joe


Darth Eugene Vader
 
Posts: 1041 | Location: Puerto Rico, USA | Registered: 28 October 2005Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
You might find this usefull

Word DocCapacity_Leveling_instructions.doc (1,294 Kb, 20 downloads) Capacity Leveling Instructions
 
Posts: 26 | Location: Houston Texas | Registered: 05 October 2005Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
Thanks John. Looks like that will cover everything.
 
Posts: 18 | Location: California | Registered: 11 December 2006Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
Would like to share with you our practice with regard to heavy equipments scheduling like cranes, forklift......

First of all we create an operation on the maintenance order with specific work center for heavy equipment department example (EQW_EOY), then we schedule the required hours on another transaction where we do have a conference call with all maintenance parties along with Heavy equipment department where the highest plant rank will be picked up.

Mansour
 
Posts: 1 | Location: Saudi Arabia , Yanbu | Registered: 26 April 2004Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
Thanks Mansour
I think the best way to reserve a piece of equipment is through Outlook or other email/secheudling software. We use it to reserve conference rooms and it works well.
 
Posts: 18 | Location: California | Registered: 11 December 2006Reply With QuoteEdit or Delete MessageReport This Post
 Previous Topic | Next Topic powered by eve community Page 1 2  
 


Copyright © 2004-2008 NetexpressUSA Inc. All rights reserved.