OK... here's my issue.
Any direction on applying counter readings from the Header area down to the multiple maintenance items included within the plan. I am using ip43. My plan is to take a single piece of equipment and isolates each of 9 specific maint areas. Each of these areas are to generate a call object at different run hours...engine;every15K transmission:every 30K...brakes;every 6K, etc. I have established measure points for each specific task area (engine, transmission, electrical, etc)which get their values through a measurement reading transfer using the counter found on Maint Plan header level. I cannot determine a method to attach the newly created measure points to each item at the item level. I realize that I can make a maint plan (IP41) for each specific task, but User requires that all tasks remain within same plan. |
|||
|
Look like your main plan is very detailed. Perhaps you need to talk to ICT to modify the CMMS a bit to cater for new requirements. Good luck and tell us the solution!
|
||||
|
| Previous Topic | Next Topic | powered by eve community |
| Please Wait. Your request is being processed... |
|