I was wondering if anyone knew of any good resouces, websites, people to talk to etc in reference to capacity planning. We are looking at implementing capacity planning and have limit knowledge of its functions and what exactly its capable of or how to use the functions in general

Also if anyone knows of any good training resources for the PM module in general.

thanks
 
Posts: 16 | Location: Canada | Registered: 21 October 2006Reply With QuoteReport This Post
Posted Hide Post
Are you talking about from the design of a green-field plant, from a maintenance perspective, operations perspective?
 
Posts: 67 | Location: Knoxville Tennessee | Registered: 24 February 2006Reply With QuoteReport This Post
Posted Hide Post
I'm talking from a maintenance/maintenace planning perspective
 
Posts: 16 | Location: Canada | Registered: 21 October 2006Reply With QuoteReport This Post
Posted Hide Post
I suggest to:
* first: study the topic out of the CMMS, maybe with a good handbook on Maintenance Engineering or Maintenance Planning,
* second: after knowing what capacity planning is, verify your parameters configuration at SAP R/3


Darth Eugene Vader
 
Posts: 1044 | Location: Puerto Rico, USA | Registered: 28 October 2005Reply With QuoteReport This Post
Posted Hide Post
Christine

Please use find function on this site to search for a document I posted on 23rd August 2006 on this subject.
 
Posts: 155 | Location: Melbourne, Australia | Registered: 05 May 2004Reply With QuoteReport This Post
Reg
Posted Hide Post
Capacity scheduling is available in SAP and made easy to use via a Graphical Scheduling tool from www.prometheusgroup.us
 
Posts: 11 | Location: Canada | Registered: 20 December 2007Reply With QuoteReport This Post
Posted Hide Post
Configured correctly in SAP the capacity scheduling tool is already easy to use. The hard bit is getting the configuration right to start with.
 
Posts: 155 | Location: Melbourne, Australia | Registered: 05 May 2004Reply With QuoteReport This Post
Posted Hide Post
What David says is true, it is an easy function to perform without spending extra dollars on add ons.
We had an HR module implemented to our SAP ECC6.0 and it had made the job even easier. All our capacities are automated via the org chart in the HR mdoule.
 
Posts: 10 | Location: Australia | Registered: 10 March 2009Reply With QuoteReport This Post
Posted Hide Post
I think the most important thing to be able to dutilise capacity planning is setting the work centres correct.Also, you have to set up the hours for each of the work centers.
We had done it in our implementation and I may have the training material available with me.I will post it if this is readily available with me.By the time, please check how the set up of the workcenter in SAP-PM Moduleat your site
 
Posts: 29 | Location: qatar | Registered: 13 August 2007Reply With QuoteReport This Post