Meter based PM's Login/Join
 
posted
I have a meter based PM that generates a work order at 50 hours. The work didn't occur until 80 hours. Does or can Maximo capture the fact we had 80 hours of operation rather than 50 when the work was performed? The only method I can find is to write down the starting meter reading and then record the meter reading at completion. I would think there has to be a method to see this in Maximo somewhere.

John
 
Posts: 6 | Location: houston tx | Registered: 29 November 2005Reply With QuoteReport This Post
posted Hide Post
You should be able to enter the actual meter reading.
 
Posts: 4285 | Location: Borneo | Registered: 13 February 2005Reply With QuoteReport This Post
posted Hide Post
Maximo ver.6 much more powerful than 4.1 or 5.2. It keeps a history table of the meter readings. http://www.datapaste.com/
 
Posts: 13 | Location: Seattle | Registered: 12 January 2007Reply With QuoteReport This Post
posted Hide Post
What version are you using?
 
Posts: 6 | Location: Michigan | Registered: 01 July 2010Reply With QuoteReport This Post
posted Hide Post
rfisc01,
quote:
What version are you using?

Probably a different one now. The question was originally posed in 2006.
 
Posts: 199 | Location: Ontario, Canada | Registered: 06 May 2004Reply With QuoteReport This Post