Hi All,

One of our customer in Pakistan has 04 no. refrigeration package units, which they want to get it overhauled.

Mechanical Ref. Unit, 60 TPD CO2 Recovery System

Options available are,

1) Send 2 compressors at a time to Dubai to get it overhauled from the OEM.

2) A service Engineer comes in to do this major overhaul at site in Pakistan.

My question is, how what is the time frame both the options.

The OEM demanded 40 days for this overhaul and additional 15 days for installation and commissioning.

Please suggest. If you need further info, let me know.
 
Posts: 95 | Location: Karachi | Registered: 29 December 2006Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
Are you looking if someone on this forum can do the job?


Steven van Els, CMRP
 
Posts: 830 | Location: Suriname | Registered: 16 June 2004Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
steven,

If you let me know it would be great.

May be I can discuss some technical aspects of the project and who knows, we can do business together.

Regards

Zeeshan
 
Posts: 95 | Location: Karachi | Registered: 29 December 2006Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
Is this the first time the screw comps being overhaulled?

Is the service engineer coming from the OEM or other contractor?

How many of the comps are needed for operations at one time? What is the capacity for each comp?
 
Posts: 2443 | Location: Borneo | Registered: 13 February 2005Reply With QuoteEdit or Delete MessageReport This Post