Join or Manage Your Profile
Posting Boards
Machinery Condition Monitoring and Predictive Maintenance
Posts About Technologies and Techniques for Condition Monitoring
PdM Program specific KPI's|
Go
![]() |
New
![]() |
Find
![]() |
Notify
![]() |
Tools
![]() |
Reply
![]() |
|
I am looking for input on PdM specifice KPI's not the ones used at the Reliability Program level, but PdM specific. Some of what I look at are:
Cost Savings of PdM find vs. run to failure. Pdm Program efficiency which is the Pdm program costs/total cost savings. (percentage) Lost production ratio which is a ratio of time to perform total replacement vs time to repair. Cost efficiency which is cost savings/cost of replacement if run to failure. Cost per data point which is all program costs including training, travel, equip amort, manpower/ avg. number of data points. This one is kind of out there but was requested. What do some of the rest of you do to justify your existance? |
|||
|
Perhaps you are looking for the same thing as this gentleman in the relaibility forum:
http://maintenanceforums.com/eve/forums/a/tpc/f/209103451/m/7191020131/r/9091010231#9091010231 |
||||
|
Not really, but the lack of response to the posting in this portion of the board tells me that most likely a lot of people are not really measuring the effectiveness of their programs.
|
||||
|
|
||||
|
| Previous Topic | Next Topic | powered by eve community |
| Please Wait. Your request is being processed... |
|
Join or Manage Your Profile
Posting Boards
Machinery Condition Monitoring and Predictive Maintenance
Posts About Technologies and Techniques for Condition Monitoring
PdM Program specific KPI's
