In Barge mounted Gas turbine Plant what are all the condition based assesment test required.., can anyone explain me in details?

Its GE LM 6000 engine plant, fuel is Naptha...Its combined cycle plant. Total 220 MW
Thanks in Advance...
Gurusamy
 
Posts: 42 | Location: Mangalore | Registered: 19 July 2007Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
This set has probably got Bently Nevada radial and axial probes attached, which are linked to a panel where you can retrieve various CM information from the buffered outputs.
 
Posts: 31 | Location: UK | Registered: 16 March 2007Reply With QuoteEdit or Delete MessageReport This Post
Posted Hide Post
yes its monitored by Bentlys Accelereometer(VM6000 Series)..wanted to know that what are are all the tests required for Condition Assesment of 7 year old Gas turbine power plant..
 
Posts: 42 | Location: Mangalore | Registered: 19 July 2007Reply With QuoteEdit or Delete MessageReport This Post